{"id":59896,"date":"2024-06-22T18:25:04","date_gmt":"2024-06-22T18:25:04","guid":{"rendered":"https:\/\/immo.lecourrier.es\/index.php\/2024\/06\/22\/acciona-doublera-sa-fourniture-delectricite-a-metro-de-madrid-en-2015\/"},"modified":"2026-03-03T23:06:59","modified_gmt":"2026-03-03T23:06:59","slug":"acciona-doublera-sa-fourniture-delectricite-a-metro-de-madrid-en-2015","status":"publish","type":"post","link":"https:\/\/immo.lecourrier.es\/index.php\/2024\/06\/22\/acciona-doublera-sa-fourniture-delectricite-a-metro-de-madrid-en-2015\/","title":{"rendered":"Acciona doublera sa fourniture d\u2019\u00e9lectricit\u00e9 \u00e0 Metro de Madrid en 2015"},"content":{"rendered":"<p>Madrid, 8 sep. (EP)  Acciona Energ\u00eda doublera l\u2019ann\u00e9e prochaine sa fourniture d\u2019\u00e9lectricit\u00e9 \u00e0 Metro de Madrid suite \u00e0 l\u2019adjudication de 46% de l\u2019\u00e9nergie totale soumissionn\u00e9e par la soci\u00e9t\u00e9 de transport m\u00e9tropolitain pour 2015, pour un montant de 19,8 millions d\u2019euros.  Le contrat pass\u00e9 avec Metro de Madrid comprend la fourniture de 308 gigawatts heure (GWh) d\u2019\u00e9lectricit\u00e9 afin d\u2019alimenter les points de traction et les installations de la soci\u00e9t\u00e9 concessionnaire du transport suburbain de Madrid durant toute l\u2019ann\u00e9e 2015.  Cet apport repr\u00e9sente le double du volume actuel d\u2019\u00e9nergie fournie par rapport au contrat pr\u00e9c\u00e9dent et l\u2019accroissement substantiel de la participation d\u2019Acciona dans la totalit\u00e9 soumissionn\u00e9e par Metro, qui passe de 21% \u00e0 46%.  La soci\u00e9t\u00e9, par le biais de sa filiale ACCIONA Green Energy Developments, poursuit ainsi la consolidation de son activit\u00e9 de commercialisation d\u2019\u00e9lectricit\u00e9 aupr\u00e8s de grands clients, repr\u00e9sentant l\u2019ann\u00e9e derni\u00e8re une facturation de 367 millions d\u2019euros.  Acciona Energ\u00eda fournit en exclusivit\u00e9 de l\u2019\u00e9lectricit\u00e9 d\u2019origine renouvelable, 100% libre d\u2019\u00e9missions, certifi\u00e9e comme telle par la Commission Nationale des March\u00e9s et de la Concurrence (CNMC).  En 2013, elle a fourni 5.110 GWh, soit 55% de plus que l\u2019ann\u00e9e pr\u00e9c\u00e9dente.  Parmi les clients d\u2019ACCIONA Green Energy Developments figurent \u00e9galement d\u2019autres soci\u00e9t\u00e9s industrielles et de services \u00e9minentes, telles qu\u2019Aena, Seat-Volkswagen, Canal de Isabel II Gesti\u00f3n et Acuamed.  EUROPA PRESS &#8211; Le Courrier d&rsquo;Espagne avec Sol Marzellier de Pablo (www.smtraductores.com)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Madrid, 8 sep. (EP) Acciona Energ\u00eda doublera l\u2019ann\u00e9e prochaine sa fourniture d\u2019\u00e9lectricit\u00e9 \u00e0 Metro de Madrid suite \u00e0 l\u2019adjudication de 46% de l\u2019\u00e9nergie totale soumissionn\u00e9e par la soci\u00e9t\u00e9 de transport m\u00e9tropolitain pour 2015, pour un montant de 19,8 millions d\u2019euros. Le contrat pass\u00e9 avec Metro de Madrid comprend la fourniture de 308 gigawatts heure (GWh) [&hellip;]<\/p>\n","protected":false},"author":462,"featured_media":43829,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[212],"tags":[384],"class_list":["post-59896","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","tag-business"],"acf":[],"_links":{"self":[{"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/posts\/59896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/users\/462"}],"replies":[{"embeddable":true,"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/comments?post=59896"}],"version-history":[{"count":0,"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/posts\/59896\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/media\/43829"}],"wp:attachment":[{"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/media?parent=59896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/categories?post=59896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/immo.lecourrier.es\/index.php\/wp-json\/wp\/v2\/tags?post=59896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}